ELT into one warehouse
Why · AIS, schedules and weather only become useful once they can be joined in one place.
Trade-off · Live AIS data is high-volume, so storage and load frequency need planning.
An end-to-end data engineering and predictive analytics platform that monitors maritime supply chain bottlenecks and carbon output, built for logistics managers.
The flow
01
Telemetry
Live AIS, port schedules and weather
02
ELT
Automated loads into one warehouse
03
Transform
Spatial-temporal logic
04
Predict
XGBoost delay and fuel models
05
Act
Alerts and carbon-cost advice
01
Maritime supply chains generate constant data, from vessel positions to port schedules and weather, but it arrives in separate feeds. Logistics managers struggle to see bottlenecks forming, or what delays cost in fuel and carbon, until it's too late to act.
Raft is meant to bring those feeds together, predict where delays and fuel waste will happen, and turn that into decisions a logistics manager can make today.
02
Pull in live AIS vessel tracking, port schedules and meteorological feeds on a schedule, with no manual exports.
Load each feed through an ELT pipeline into a centralised data warehouse, keeping the raw data so any transformation can be rebuilt.
Apply spatial-temporal transformation logic to turn raw positions and timestamps into voyages, port calls, queues and congested routes.
Train machine learning models such as XGBoost to forecast how long port delays will last, and calculate where fuel consumption departs from what's expected.
Visualise route congestion on a monitoring dashboard, so bottlenecks are visible while they're forming.
Send real-time anomaly alerts and give predictive recommendations that weigh carbon against cost, so logistics managers know what to change.
03
Why · AIS, schedules and weather only become useful once they can be joined in one place.
Trade-off · Live AIS data is high-volume, so storage and load frequency need planning.
Why · It handles mixed tabular features like schedules, weather and vessel history well, and its predictions can be explained.
Trade-off · Features have to be engineered carefully from the spatial-temporal data for it to work.
Why · Logistics managers need to know what to do, not only what's happening.
Trade-off · Every recommendation has to be trustworthy, so its reasoning needs to be shown.
04
Raft is at the idea stage. This page captures the concept before I start building it.
First up: one port, ingesting AIS and schedule data into the warehouse, with a first delay forecast on top.
Next · Lineage
Aegis